SRT Hellcat Forum banner

Current 2022 Hellcat Production Numbers

62207 985
I wasn't sure where best to place this so hopefully this works here.

I have been updating a few other threads here occasionally with single group numbers but figured someone might appreciate the full Hellcat numbers to date.

This is the complete breakdown of all 2022 Hellcat Challengers/Chargers that I have been able to find build to date.

If anyone has seen my TRX posts over on RAMTRX then they already will recognize this chart style.
Every column is Built / Shipped (Build Sheet / Window Sticker)

Ex:
So for the YTD total they have built 6074 and shipped 5818 of those as of today.
Built 357 Octane Red and shipped 344
California is in the lead currently with 611 built, 591 of those shipped.
etc

The bar chart at the top is grouped by week, with the 7th week of the year being when the first Hellcat came down the line, (ignoring the pilot cars built long before then)



If anybody has any questions/suggestions I will do my best to accommodate.

CHART UPDATED VIEW DATE IN CHART

Font Rectangle Screenshot Parallel Symmetry
  • Hey Everyone! Enter your ride HERE to be a part of this months Ride of the Month Challenge!
641 - 660 of 986 Posts

·
Registered
Joined
·
70 Posts
My SS was at final inspection right before the shut down... but does not show as vehicle built only in production on Sept 22. So, questions is are people still working on the shipping side during a closure? Ultimately my question is... will my car ship during the closure, if it was finished building?
 

·
Registered
Joined
·
389 Posts
Discussion Starter · #646 ·
My SS was at final inspection right before the shut down... but does not show as vehicle built only in production on Sept 22. So, questions is are people still working on the shipping side during a closure? Ultimately my question is... will my car ship during the closure, if it was finished building?
Can't say for sure about your specific car, but cars are still shipping. The Window Sticker posts I have made every evening this past week since the shutdown started are of cars being finished and released for shipping. The numbers are definitely lower than typical when the plant is in full operation.
 

·
Registered
Joined
·
428 Posts
My SS was at final inspection right before the shut down... but does not show as vehicle built only in production on Sept 22. So, questions is are people still working on the shipping side during a closure? Ultimately my question is... will my car ship during the closure, if it was finished building?
finished cars that have passed QC will continue to ship. Did your build sheet show up yet? That usually means the car is awaiting shipping. Even if your car is stuck in the plant, the good news is that all the built cars in the lot awaiting shipping will be purged out. When your car is ready to ship, that should go faster than expected.
 

·
Registered
Joined
·
70 Posts
Can't say for sure about your specific car, but cars are still shipping. The Window Sticker posts I have made every evening this past week since the shutdown started are of cars being finished and released for shipping. The numbers are definitely lower than typical when the plant is in full operation.
Thanks for the info... I am getting antsy!
 

·
Registered
Joined
·
70 Posts
finished cars that have passed QC will continue to ship. Did your build sheet show up yet? That usually means the car is awaiting shipping. Even if your car is stuck in the plant, the good news is that all the built cars in the lot awaiting shipping will be purged out. When your car is ready to ship, that should go faster than expected.
I did get a build sheet a few days before the plant closed... so I thought that was a positive move! And that is fantastic news... so thanks for the info!
 

·
Registered
Joined
·
389 Posts
Discussion Starter · #652 ·
Anyone ever have the tracker change from a delivery date to TBD after the car was built and should have been shipped?
That is the way almost all of them have been for the past couple months, will have a date listed up until it shows it has shipped then goes to TBD. At that point it’s out of the factory’s hands and is on the many shipping companies that handle it depending on where it’s going so I believe they change to date since they are just relying on others for info.
 

·
Registered
HCWBCHARGER ON ORDER
Joined
·
64 Posts
Dodge Rep got back to the sales manager and said my car is scheduled for 11-28 due to waiting on parts. I wonder how reliable this information is or if they are just shooting out a future date so i'm not asking them about it once a week :oops:
 
641 - 660 of 986 Posts
Top