SRT Hellcat Forum banner

Demon 170 Production Numbers

558K views 4.3K replies 210 participants last post by  Demon Fan 777  
Second Demon getting built today White Knuckle
The guy that did the configuration charts died of cancer in 2021. Just to let you know.
The silver Demon was being dropped off a the Mopar Nationals.
How do you know second car is white knuckle and being built today? 😊.
 
Mine was at D1 with an estimated 8/5 delivery. Dealer called today and I’m back to D status with no delivery date
I am in the same boat. I ordered first day 3/28 Vin match on a car i ordered new and still will have , true MSRP order and I was told a November date. How does that work? Total BS.
 
Here is a thought what will happen with all the extra Demon sub assemblies that will never be built into cars if this strike shuts dow Brampton and they don’t build all the cars or even half of them . Aren’t the engines made in Mexico ? Rear ends so on. All the specialized parts for that car. Those parts aren’t made in volume in a day it takes time to ramp up to get the supply chain going For those parts. Dodge and it’s subs could get burned hard for a big chunk of cash.
 
I don’t have much faith anymore with 20-35 cars a day . I am a 2nd day order vin match MSRP. Early vin and von and still in D. If I don’t get a car while watching the Jonny come late car flippers get theirs I will not be purchasing anymore Mopar products and I have a bunch of them . I know stellantis won’t care but that’s my thoughts.
Tim K. Call me
 
I sure hope you’re right. I hope everyone gets their cars. It makes no sense that they can only put out what they are per day. i would think 70 cars a day out of 650 wouldn’t be a stretch but what do I know .